Skip to content

14. First Power ON

Overview

Connect the power adapter. Initial power-up test.

Assembly

1. Connect The Power Adapter

Use DC5.5 Wire With Switch to connect to the power input port of the motion controller board and the output port of the Power Adapter . Connect the power adapter to the power source (AC110\~220V) through the Power Cable US/EU/Other.

2. Initial Power-Up Test

Turn on the power switch on the DC5.5 Wire With Switch.

3. Congratulations!

Now you have completed the assembly of all mechanical and electronic components.

Next, you will connect the machine to the computer via the USB cable and use OpenPnP to control the machine.